Construction and Detours

This Construction and Detours Database is used for City of Windsor and Windsor Utilities Commission (WUC) projects only. If the project you are looking for is not listed below, please visit Municipal 511.  

Using the Construction and Detours Database

You can search and sort projects by several convenient methods:

  • Filter according to time, choosing from All, Current, Planned or Complete.
  • Keyword Search by street name, project type or any word that may appear in the entry.
  • By column, you can click the heading of any column to sort by that category in either ascending or descending order.​
  • By page, you can move from page to page (ten entries per page) using the buttons at the bottom.

Expand the listing to learn more by clicking the plus + symbol and close it by clicking the minus - symbol.

Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Argyle Road, Richmond Street and Devonshire Road (From see description to see description) 4/4/2022 7/22/2022 Monday, April 04, 2022 to Friday, July 22, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on:

Argyle Road - Richmond Street to Ottawa Street (Ward 4)

Richmond Street - Argyle Road to Devonshire Road (Ward 4)

Devonshire Road - Richmond Street to Willistead Crescent (Ward 4)

WUC Contract 2022-002 Pre-Construction Letter DAR.pdfWUC Contract 2022-002 Pre-Construction Letter DAR.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Complete watermain Complete All 04/04/2022 00:00:00 07/22/2022 00:00:00
Argyle Road/Niagara Street (From see description to see description) 5/16/2022 8/19/2022 Monday, May 16, 2022 to Friday, August 19, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on:

Argyle Road from Wyandotte Street East to Niagara Street (Ward 4)

Niagara Street from Kildare Road to Walker Road (Ward 4)

WUC Contract 2022-002 Pre-Construction Letter Argyle Niagara.pdfWUC Contract 2022-002 Pre-Construction Letter Argyle Niagara.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Complete watermain,bridge Complete All 05/16/2022 00:00:00 08/19/2022 00:00:00
Arthur Road (From Ontario Street to VIA Rail) 8/31/2022 11/30/2022 Wednesday, August 31, 2022 to Wednesday, November 30, 2022

​Arthur Road will be closed for storm and sanitary sewer, watermain and pavement rehabilitation from Ontario Street to VIA Rail. Local Traffic Only.

Sarah Meneses, P. Eng. (519) 255-6100 x6336 SheaRock Construction Group Inc. Complete road,sewer,watermain Complete All 08/31/2022 00:00:00 11/30/2022 00:00:00
Aubin Road and Reginald Street (From see description to see description) 7/18/2022 12/23/2022 Monday, July 18, 2022 to Friday, December 23, 2022

​Aubin Road from Seminole Street to Alice Street and Reginald Street from Aubin Road to Westcott Road will be closed for approximately five months for sewer, pavement, watermain and streetlighting rehabilitation. Local traffic will be permitted only. The westbound lane of Seminole Street will be shifted around the area of construction at the intersection of Aubin and Seminole as needed.

Joe Bressan, EIT Engineering 1, Operations (519) 255-6100 x6890 Sterling Ridge Infrastructure Inc. Complete sewer,road,watermain Complete All 07/18/2022 00:00:00 12/23/2022 00:00:00
Banwell Road (From Palmetto Street to Mulberry Drive/Wildwood Drive) 8/2/2022 6/30/2023 Tuesday, August 02, 2022 to Friday, June 30, 2023

​Installation of storm sewers, road widening (including trail and sidewalks), roundabout and streetlights on Banwell Road from Palmetto Street to Mulberry Drive/Wildwood Drive. Alternating traffic lanes. Local traffic only.

The southbound lane on Banwell Road between Palmetto Street and Mulberry/Wildwood Drive will be closed on Thursday, September 1 from 9:00am to 3:00pm and on Friday, September 2 from 9:00am to 2:00pm for streetlight work. Local traffic only.

As part of the Banwell Road improvements, Phase 2, the Wildwood Drive/Banwell Road intersection will be closed to traffic for sewer work. From 7:00am to 5:00pm on Monday, October 3 to Thursday, October 6, 2022.

Paul Mourad, P. Eng. (519) 255-6100 x6119 SheaRock Construction Group Inc. Current sewer,road,sidewalk Current All 08/02/2022 00:00:00 06/30/2023 00:00:00
Broadway Street (From Ojibway Parkway to Machette Road) 1/19/2023 1/19/2023 Thursday, January 19, 2023

​Broadway Street will be closed between Ojibway Parkway and Matchette Road for ditch brushing. From 8:00am to 4:00pm on Thursday, January 19, 2023.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Belmont Complete road Complete All 01/19/2023 00:00:00 01/19/2023 00:00:00
Cabana Corridor Improvements Phase 3 (From Dougall Avenue to Dominion Boulevard) 6/9/2022 12/20/2022 Thursday, June 09, 2022 to Tuesday, December 20, 2022

​Cabana Road West from Dougall Avenue to Dominion Boulevard will have isolated lane restrictions for boulevard restoration and surface asphalt pavement.

Jane He, P. Eng., Engineering (519) 255-6257 x6358 Amico Infrastructures Complete road Complete All 06/09/2022 00:00:00 12/20/2022 00:00:00
Cabana Road West - Phase 4 (From Northway Avenue to Dominion Boulevard) 6/7/2022 12/20/2022 Tuesday, June 07, 2022 to Tuesday, December 20, 2022

​Cabana Road West will have isolated lane restrictions between Northway Avenue and Dominion Boulevard for Enwin Utility Contract and the relocation of hydro lines.

Notice to Homeowner - Cabana Ph 4 - ENWIN.pdfNotice to Homeowner - Cabana Ph 4 - ENWIN.pdf

Jane He, P. Eng., Engineering (519) 255-6257 x6358 Enwin Utility/Black and McDonald Complete road Complete All 06/07/2022 00:00:00 12/20/2022 00:00:00
Devonshire Road (From Richmond Street to Ontario Street) 3/25/2022 6/3/2022 Friday, March 25, 2022 to Friday, June 03, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on Devonshire Road from Richmond Street to Ontario Street (Ward 4).

WUC Contract 2022-002 Pre-Construction Letter Devonshire.pdfWUC Contract 2022-002 Pre-Construction Letter Devonshire.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Complete watermain,bridge Complete All 03/25/2022 00:00:00 06/03/2022 00:00:00
Dominion Boulevard (From Northwood Street to Labelle Street) 4/11/2022 8/3/2022 Monday, April 11, 2022 to Wednesday, August 03, 2022

Dominion Boulevard North and South Bound, from Northwood Street to Labelle Street will be down to a single lane in both directions for approximately 80 days for bridge rehabilitation.

Brian Rempel (519) 255-6560 x4333 Coco Paving Complete bridge Complete All 04/11/2022 00:00:00 08/03/2022 00:00:00
Dougall Avenue (From Ouellette Avenue to Eugenie Street West) 8/8/2022 12/16/2022 Monday, August 08, 2022 to Friday, December 16, 2022

​Dougall Avenue from Ouellette Avenue to Eugenie Street West will be closed for approximately 3 months for storm sewer, pavement, watermain and street lighting rehabilitation. Local traffic will be permitted only. The southbound lane of Dougall Avenue will be closed during working hours.

Patrick Muzyka, P. Eng. Technologist III (519) 255-6100 x6472 Sherway Contracting (Windsor) Limited Complete road,sewer,watermain Complete All 08/08/2022 00:00:00 12/16/2022 00:00:00
Drouillard Road (From Wyandotte Street East to Edna Street) 12/5/2022 12/12/2022 Monday, December 05, 2022 to Monday, December 12, 2022

​Drouillard Road will be closed between Wyandotte Street East and Edna Street for curb and sidewalk replacement. No through traffic. On Monday, December 5 to Monday, December 12, 2022.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 PieraCon Complete curb,sidewalk Complete All 12/05/2022 00:00:00 12/12/2022 00:00:00
Drouillard Road (From Wyandotte Street East to Edna Street) 12/8/2022 12/16/2022 Thursday, December 08, 2022 to Friday, December 16, 2022

​Drouillard Road is closed between Wyandotte Street East and Edna Street for curb and sidewalk replacement. No through traffic. Ongoing until Friday, December 16, 2022.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 PieraCon Complete curb,sidewalk Complete All 12/08/2022 00:00:00 12/16/2022 00:00:00
Eastlawn Avenue (From Wyandotte Street East to Edgar Street) 3/24/2022 5/31/2022 Thursday, March 24, 2022 to Tuesday, May 31, 2022

Eastlawn Avenue from Wyandotte Street East to Edgar Street will be closed for approximately 2 months for sewer, pavement, watermain, sidewalk and streetlighting rehabilitation. Local Traffic only.

Andrew Dowie, P. Eng., (519) 255-6257 x6490 Sterling Ridge Infrastructure Inc. Complete road,sewer,sidewalk,watermain Complete All 03/24/2022 00:00:00 05/31/2022 00:00:00
E.C. Row Avenue East (From East of 9455 Anchor Drive to Banwell Road) 8/25/2022 3/31/2023 Thursday, August 25, 2022 to Friday, March 31, 2023

​Temporary Road closure on EC ROW Avenue East between East side of 9455 Anchor Drive and Banwell Road.  The closure is due to restore boulevard construction in this area. Proper pedestrian and traffic signs will be present.

Patrick Winters, Development Engineer, (519)255-6257 x6462 A-BM - Brian Conklin, Senior Project Manager Current road Current All 08/25/2022 00:00:00 03/31/2023 00:00:00
E.C. Row Expressway (From Huron Church Road to Howard Avenue) 4/13/2022 8/5/2022 Wednesday, April 13, 2022 to Friday, August 05, 2022

​E.C. Row Expressway will have lane restrictions in both directions between Huron Church Road and Howard Avenue for approximately 17 weeks for road reconstruction.

E.C. Row Expressway Eastbound On ramp at Dominion Boulevard and Off ramp at Dougall Avenue will be closed for approximately the next 50 days. From April 28 to July 25 - weather permitting.

E.C. Row Expressway Westbound On ramp at Dougall Avenue will have daily shoulder closures for approximately the next 14 days. May 11 to May 25 - weather permitting.

E.C. Row Expressway Eastbound OFF ramp at Dominion Boulevard will be CLOSED for approximately 4 hours (10:00am - 2:00pm) on Wednesday, May 25 - weather permitting.

CJ Hartford Contracts Coordinator Operations (519) 945-9971 x4234 Coco Paving Complete road Complete All 04/13/2022 00:00:00 08/05/2022 00:00:00
E.C. Row Expressway Ramp and Lane Closures (From Lauzon Parkway to Jefferson Boulevard) 3/9/2021 3/9/2021 Tuesday, March 09, 2021 Ramp and Lane closures on E.C. Row Expressway between Jefferson Boulevard and Lauzon Parkway for guardrail repairs will affect traffic flow.

Closure of eastbound on-ramp at Lauzon Parkway, 9 a.m. to 12 p.m.
Closure of eastbound off-ramp at Lauzon Parkway and northbound lane restrictions, 12 p.m. to 2 p.m.
Westbound lane restrictions between Lauzon Parkway and Jefferson Boulevard, 12 p.m. to 3 p.m.
Michael Cappucci, Contracts Coordinator 519-255-6326 Royal Fence Complete None. Complete All 03/09/2021 00:00:00 03/09/2021 00:00:00
Ellrose Avenue and Milloy Street (From see description to see description) 7/21/2022 10/31/2022 Thursday, July 21, 2022 to Monday, October 31, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on:

Ellrose Avenue from Milloy Street to Tecumseh Road East (Ward 5)

Milloy Street from Bernard Road to Aurthur Road (Ward 5)

WUC Contract 2022-009 Pre-Construction Letter Ellrose Milloy.pdfWUC Contract 2022-009 Pre-Construction Letter Ellrose Milloy.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 07/21/2022 00:00:00 10/31/2022 00:00:00
Francois Road (From Alice Street to Tecumseh Road East) 8/4/2022 11/11/2022 Thursday, August 04, 2022 to Friday, November 11, 2022

​The Windsor Utilities Commission will be resonstructing the watermains on:

Francois Road - Alice Street to Tecumseh Road East

WUC Contract 2022-009 Pre-Construction Letter Francois.pdfWUC Contract 2022-009 Pre-Construction Letter Francois.pdf


Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 08/04/2022 00:00:00 11/11/2022 00:00:00
George Avenue (From Ontario Street to Tecumseh Road East) 4/4/2022 8/26/2022 Monday, April 04, 2022 to Friday, August 26, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on: George Avenue from Ontario Street to Tecumseh Road East (Ward 5).

WUC Contract 2022-003 Pre-Construction Letter George.pdfWUC Contract 2022-003 Pre-Construction Letter George.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Complete watermain Complete All 04/04/2022 00:00:00 08/26/2022 00:00:00
Giles Boulevard East (From Parent Avenue to Gladstone Avenue) 7/4/2022 11/30/2022 Monday, July 04, 2022 to Wednesday, November 30, 2022

​Giles Boulevard East from Gladstone Avenue to Parent Avenue will be under construction for storm sewer, watermain and pavement rehabilitation work. Giles Boulevard East will be partially closed. The closure of lanes and intersections will depend on the progress of construction and may/may not permit local traffic and side road parking. Please follow the detour signage and drive carefully.

The intersection of Giles Boulevard East and Parent Avenue will be fully closed for constuction on Monday July 18, 2022 only. No traffic will be permitted. The purpose of this closure is to install new watermain as part of Giles Bolevard East Rehabilitation project.

Aojeen Issac, P. Eng. Engineering Department (519) 255-6257 x6368 J.C.S. Construction Inc. Complete road,sewer,watermain Complete All 07/04/2022 00:00:00 11/30/2022 00:00:00
Gladstone Avenue and Seneca Street (From see description to see description) 6/6/2022 8/26/2022 Monday, June 06, 2022 to Friday, August 26, 2022

​The Windsor Utlilties Commission will be reconstructing the watermains on:

Gladstone Avenue from Tecumseh Road East to Seneca Street (Ward 4)

Seneca Street from Gladstone Avenue to Moy Avenue (Ward 4)

City Ops Contract 18-22 Pre-Construction Letter Gladstone Seneca.pdfCity Ops Contract 18-22 Pre-Construction Letter Gladstone Seneca.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 06/06/2022 00:00:00 08/26/2022 00:00:00
Glenwood Pedestrian Bridge Closure (Grand Marais Drain) 7/25/2022 9/30/2022 Monday, July 25, 2022 to Friday, September 30, 2022

​Glenwood Pedestrian Bridge over Grand Marais Drain will be closed for reconstruction. No pedestrian access will be allowed during construction. From Monday, July 25 until Friday, September 30, 2022.

Phong Nguy Manager of Contracts, Field Services and Maintenance (519) 255-6326 Front Construction Industries Inc. Complete bridge Complete All 07/25/2022 00:00:00 09/30/2022 00:00:00
Glidden Avenue (From Wyandotte Street East to CNR rail tracks) 3/2/2022 6/10/2022 Wednesday, March 02, 2022 to Friday, June 10, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on Glidden Avenue from Wyandotte Street East to CNR Tracks (Ward 6).

WUC Contract 2021-027 Pre-Construction Letter Glidden.pdfWUC Contract 2021-027 Pre-Construction Letter Glidden.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Complete watermain Complete All 03/02/2022 00:00:00 06/10/2022 00:00:00
Hawthorne Drive (From Roseville Park to Lauzon Road) 5/11/2022 7/25/2022 Wednesday, May 11, 2022 to Monday, July 25, 2022

​Partial lane closures along Hawthorne Drive for the construction of asphalt pathways. Work will primarily take place off the roadway, but lane restrictions may occasionally be required. A flag person will be present when traffic is reduced to one lane of traffic.

Juan Paramo, Transportation Planning (519) 999-6378 PieraCon Complete road Complete All 05/11/2022 00:00:00 07/25/2022 00:00:00
Iroquois Street (From Windermere Road to Argyle Road) 3/14/2022 5/20/2022 Monday, March 14, 2022 to Friday, May 20, 2022

​As part of an ongoiong infrastructure renewal program, the Windsor Utilities Commission (WUC) will be installing a new 200mm PVC watermain on Iroquois Street from Windermere Road to Argyle Road (Ward 4). The project should take approximately 10 weeks to complete. Project timing is weather dependent. Tree trimming will also occur in advance by a certified sub-contractor.

WUC Contract 2021-048 Pre-Construction Letter Iroquois.pdfWUC Contract 2021-048 Pre-Construction Letter Iroquois.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Complete watermain Complete All 03/14/2022 00:00:00 05/20/2022 00:00:00
Jos St Louis (From Rose Street to Tecumseh Road East) 8/8/2022 11/4/2022 Monday, August 08, 2022 to Friday, November 04, 2022

​Jos St Louis Avenue from Rose Street to Tecumseh Road East will be closed for approximately 3 months for storm sewer, sanitary sewer , pavement and water services rehabilitation. Local traffic will be permitted only. The southbound traffic on Jos St Louis Avenue will be shifted around the area of construction. There will be temporary lane closures on Tecumseh Road East from Rivard Avenue to Clemenceau Boulevard for approximately one week for sewer work in the Jos St Louis Avenue and Tecumseh Road East intersection.

Curb work at the Jos St. Louis/Tecumseh Road East intersection will result in temporary lane closure on Tecumseh Road East and Rivard Avenue to Clemenceau Boulevard for approximately two days. From Friday, October 28, 2022 until Saturday, October 29, 2022.

Patrick Muzyka, P. Eng. Technologist III (519) 255-6100 x6472 D'Amore Construction (2000) Ltd. Complete sewer,road,watermain Complete All 08/08/2022 00:00:00 11/04/2022 00:00:00
Kildare Road (From Tecumseh Road East to Seneca Street) 8/8/2022 10/28/2022 Monday, August 08, 2022 to Friday, October 28, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on:

Kildare Road - Tecumseh Road East to Seneca Street

City Ops Contract 18-22 Pre-Construction Letter Kildare.pdfCity Ops Contract 18-22 Pre-Construction Letter Kildare.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction Complete watermain Complete All 08/08/2022 00:00:00 10/28/2022 00:00:00
Langlois Avenue (From Giles Boulevard East to Shepherd Street East) 5/18/2022 7/15/2022 Wednesday, May 18, 2022 to Friday, July 15, 2022

​Langlois Avenue is closed between Giles Boulevard East and Shepherd Street East for road and watermain reconstruction. Access for local traffic only. Ongoing until Friday, July 15, 2022.

Daniel Lopez - Engineer I Public Works Operations (519) 945-9971 D'Amore Construction (2000) Ltd. Complete road,watermain Complete All 05/18/2022 00:00:00 07/15/2022 00:00:00
Lauzon Parkway (From Twin Oaks Drive to CP Rail Bridge) 8/22/2022 10/1/2022 Monday, August 22, 2022 to Saturday, October 01, 2022

​Lauzon Parkway will have lane restrictions over the CP Rail bridge just south of Twin Oaks Drive for bridge repairs and paving. Please slow down and use caution in the construction zone.

Charles Hartford Contracts Coordinator Operations (519) 255-6326 x4234 Front Construction Industries Inc. Complete bridge,road Complete All 08/22/2022 00:00:00 10/01/2022 00:00:00
Lincoln Road (From Tecumseh Road East to Seneca Street) 5/24/2022 7/29/2022 Tuesday, May 24, 2022 to Friday, July 29, 2022

​Lincoln Road will be closed between Tecumseh Road East and Seneca Street for road and watermain work. Local traffic only. From Tuesday, May 24 to Friday, July 29, 2022.

Daryl Lundy, A.Sc.T., Contracts Supervisor (519) 255-6560 x4330 D'Amore Construction (2000) Ltd. Complete road,watermain Complete All 05/24/2022 00:00:00 07/29/2022 00:00:00
Louis Avenue (From Erie Street East to Giles Boulevard East) 2/22/2022 4/22/2022 Tuesday, February 22, 2022 to Friday, April 22, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on Louis Avenue from Erie Street East to Giles Boulevard East (Ward 4).

WUC Contract 2021-048 Pre-Construction Letter Louis.pdfWUC Contract 2021-048 Pre-Construction Letter Louis.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 D'Amore Construction (2000) Ltd. Complete watermain Complete All 02/22/2022 00:00:00 04/22/2022 00:00:00
Lynngrove Crescent, Lynngrove Court and Melville Drive (From see description to see description) 9/23/2022 11/18/2022 Friday, September 23, 2022 to Friday, November 18, 2022

​Lynngrove Crescent, Lynngrove Court and Melville Drive will be closed for approximately seven weeks for curb repairs as well as milling and paving work. Local traffic only. From Friday, September 23 until Friday, November 18, 2022.

Daryl Lundy, A.Sc.T., Contracts Supervisor (519) 255-6560 x4330 Amico Infrastructures Inc. Complete curb,road Complete All 09/23/2022 00:00:00 11/18/2022 00:00:00
Matchette Road (From Broadway Street to E.C. Row Expressway) 9/14/2022 11/4/2022 Wednesday, September 14, 2022 to Friday, November 04, 2022

​Matchette Road will have lane narrowing between Broadway Street and the westbound E.C. Row Expressway off-ramp for construction of a multi-use trail. Please watch for pylons and use caution where workers are present.

Josie Liburdi Project Coordinator Engineering (519) 255-6100 x6145 Sterling Ridge Infrastructure Inc. Complete road Complete All 09/14/2022 00:00:00 11/04/2022 00:00:00
Matthew Brady (From St. Rose Avenue to Wyandotte Street East) 8/29/2022 11/30/2022 Monday, August 29, 2022 to Wednesday, November 30, 2022

​Matthew Brady Boulevard from St. Rose Avenue to Wyandotte Street East will be closed for approximately 3 months for storm sewer, sanitary sewer, watermain and pavement rehabilitation. There will be a temporary lane closure of the eastbound lanes on Wyandotte Street East from Eastlawn Avenue to St. Paul Avenue for approximately four weeks, Monday, September 5, 2022 to Friday, September 30, 2022 for sewer work in the Matthew Brady Boulevard and Wyandotte Street Intersection. During this time Wyandotte Street East will be reduced to two lanes, one in each direction.

Adam Mourad, P. Eng. (519) 255-6100 x6614 Old Castle Contracting Inc. Complete road,sewer,watermain Complete All 08/29/2022 00:00:00 11/30/2022 00:00:00
McDougall Street (Ellis Street) 12/14/2022 12/15/2022 Wednesday, December 14, 2022 to Thursday, December 15, 2022

​Southbound McDougall Street will have lane restrictions at Ellis Street East for sewer repairs. Flag persons will be present. From 7:00am to 7:00pm on Wednesday, December 14 and Thursday, December 15, 2022.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 DanRuss Complete sewer Complete All 12/14/2022 00:00:00 12/15/2022 00:00:00
North Talbot Road (From Howard Avenue to Southwood Lakes Boulevard) 4/11/2022 6/17/2022 Monday, April 11, 2022 to Friday, June 17, 2022

​Installation of storm sewers, road widening (including bike lanes and sidewalks) and streetlights on North Talbot Road from Howard Avenue to east of Southwood Lakes Boulevard. Local Traffic only.

Paul Mourad, P. Eng. (519) 562-2448 SheaRock Construction Group Inc. Complete sidewalk,road,sewer Complete All 04/11/2022 00:00:00 06/17/2022 00:00:00
Parkside Court (From Beals Street West to 1548 Parkside Court) 11/16/2020 12/7/2020 Monday, November 16, 2020 to Monday, December 07, 2020

​Parkside Court will be closed from Beals Street West to 1548 Parkside Court for Watermain Reconstruction.

Spencer Johnston, WUC 519-251-7300 x 609 To be determined. Complete watermain Complete All 11/16/2020 00:00:00 12/07/2020 00:00:00
Provincial Road and Sixth Concession Road (From see description to see description) 9/12/2022 11/30/2022 Monday, September 12, 2022 to Wednesday, November 30, 2022

​Alternating lane restrictions will be in place on Provincial Road from south of Cabana Road East to Walker Road as well as Sixth Concession Road from Cabana Road East to the CN Rail Tracks for watermain and utility work.

Sixth Concession Road - Cabana Road East to North of CN Rail road closure

As part of the Provincial Division Corridor Improvements, Phase 3, Sixth Concession Road from Cabana Road East to Provincial Road will be closed. Flag persons will be located at each intersection to direct traffic wishing to access businesses. All parties to follow posted detour route. From Monday October 31, 2022 to Friday November 25, 2022.

Paul Mourad, P. Eng. (519) 255-6100 x6119 Green Infrastructure Partners Inc. Complete watermain Complete All 09/12/2022 00:00:00 11/30/2022 00:00:00
Rhodes Drive (From Electricity Drive to Pillette Road) 12/12/2022 12/13/2022 Monday, December 12, 2022 to Tuesday, December 13, 2022

​Rhodes Drive will have lane restrictions between Electricity Drive and Pillette Road for road repairs. Flag persons will be present. From 7:00am to 7:00pm on Monday, December 12 and Tuesday, December 13, 2022.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Diponti Paving Complete road Complete All 12/12/2022 00:00:00 12/13/2022 00:00:00
Riberdy Road (From EC Row to Foster Ave) 7/4/2022 9/23/2022 Monday, July 04, 2022 to Friday, September 23, 2022

The Windsor Utilities Commission will be reconstructing the watermains on:

Riberdy Road from EC Row to Foster Ave.

WUC Contract 2022-014 Pre-Construction Letter Riberdy.pdfWUC Contract 2022-014 Pre-Construction Letter Riberdy.pdf



Spencer Johnston, Manager Water Construction & Design (519)251-7300 x609 SheaRock Construction Complete watermain Complete All 07/04/2022 00:00:00 09/23/2022 00:00:00
Riverside Drive East (From Ford Boulevard to St. Rose Avenue) 12/1/2022 12/9/2022 Thursday, December 01, 2022 to Friday, December 09, 2022

​Eastbound and Westbound Riverside Drive East will have lane restrictions between Ford Boulevard and St. Rose Avenue for utility daylighting work. Flag persons will be present to direct the flow of traffic. Outside of work hours, traffic will be open in each direction. From 7:00am to 7:00pm until Friday, December 9, 2022 subject to weather.

Adam Mourad, P. Eng. (519) 255-6100 x6614 The Hurricane Group/City of Windsor Complete road Complete All 12/01/2022 00:00:00 12/09/2022 00:00:00
Riverside Drive East (From Louis Avenue to Marentette Avenue) 12/7/2022 12/7/2022 Wednesday, December 07, 2022

​Eastbound Riverside Drive East will have lane restrictions between Louis Avenue and Marentette Avenue for road repairs. Please slow down and use caution in the construction zone. From 8:00am to 6:00pm on Wednesday, December 7, 2022.

Roberta Harrison, Maintenance Coordinator (519) 255-6560 x4241 Diponti Paving Complete road Complete All 12/07/2022 00:00:00 12/07/2022 00:00:00
Rooney Street/Josephine Avenue (From see description to see description) 5/10/2022 8/16/2022 Tuesday, May 10, 2022 to Tuesday, August 16, 2022

​Rooney Street will be closed from Campbell Avenue to Partington Avenue and Josephine Avenue will be closed from Rooney Street to Wyandotte Street West for road and watermain reconstruction. Local traffic only.

Daniel Lopez - Engineer I Public Works Operations (519) 945-9971 J.C.S. Construction Inc. Complete road,watermain Complete All 05/10/2022 00:00:00 08/16/2022 00:00:00
Sandwich Street (From Ojibway Parkway to Chappell Avenue) 11/7/2022 12/30/2022 Monday, November 07, 2022 to Friday, December 30, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on Sandwich Street from Ojibway Parkway to Chappell Avenue (Ward 1 and 2)

WUC Contract 2022-015 Pre-Construction Letter Sandwich.pdfWUC Contract 2022-015 Pre-Construction Letter Sandwich.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 SheaRock Construction Group Inc. Complete watermain Complete All 11/07/2022 00:00:00 12/30/2022 00:00:00
Seventh Concession (From Baseline Road to Walker Road) 11/21/2022 11/22/2022 Monday, November 21, 2022 to Tuesday, November 22, 2022

​Seventh Concession will be closed at the CN Rail tracks between Baseline Road and Walker Road for mill and pave work. No through traffic will be allowed. From 7:00am Monday, November 21, to 12:00 noon Tuesday, November 22, 2022.

Daryl Lundy, A.Sc.T., Contracts Supervisor (519) 255-6560 x4330 Coco Paving Complete road Complete All 11/21/2022 00:00:00 11/22/2022 00:00:00
Tecumseh Road East (From Forest Glade Drive to Clover Avenue) 3/10/2021 8:00 AM 3/11/2021 5:00 PM Wednesday, March 10, 2021 8:00 AM to Thursday, March 11, 2021 5:00 PM

​Tecumseh Road East currently has eastbound lane restrictions between Forest Glade and Clover Avenue for catch basin repairs.

Roberta Harrison, Maintinance Corrdinator, (519) 266-65660 x4241 DanRuss Complete sewer Complete All 03/10/2021 08:00:00 03/11/2021 17:00:00
Tourangeau Road (From Milloy Street to Tecumseh Road East) 5/16/2022 8/5/2022 Monday, May 16, 2022 to Friday, August 05, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on:

Tourangeau Road from Milloy Street to Tecumseh Road East (Ward 5).

WUC Contract 2022-003 Pre-Construction Letter Tourangeau.pdfWUC Contract 2022-003 Pre-Construction Letter Tourangeau.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Major Construction (2010) Ltd. Complete watermain Complete All 05/16/2022 00:00:00 08/05/2022 00:00:00
Turner Road, Byng Road, EC Row Avenue (From see description to see description) 5/23/2022 8/12/2022 Monday, May 23, 2022 to Friday, August 12, 2022

​The Windsor Utilities Commission will be reconstructing the watermains on:

Turner Road - EC Row Avenue to Sydney Avenue (Ward 9)

Byng Road - EC Row Avenue to Sydney Avenue (Ward 9)

EC Row Avenue - Byng Road to Walker Road (Ward 9)

WUC Contract 2022-014 Pre-Construction Letter TBE.pdfWUC Contract 2022-014 Pre-Construction Letter TBE.pdf

Spencer Johnston, Manager Water Construction & Design (519) 251-7300 x609 Sherway Construction Complete watermain Complete All 05/23/2022 00:00:00 08/12/2022 00:00:00
Westminster Boulevard (From Tecumseh Road East to Adstoll Avenue) 4/5/2022 6/30/2022 Tuesday, April 05, 2022 to Thursday, June 30, 2022

​Westminster Boulevard, Tecumseh Road East to Adstoll Avenue will be closed for approximately 3 months for road and watermain reconstruction. Local traffic will be permitted only.

Daryl Lundy, A.Sc.T., Contracts Supervisor (519) 255-6560 x4330 JCS Complete road,watermain Complete All 04/05/2022 00:00:00 06/30/2022 00:00:00

Projects Under Construction

For information on projects currently under construction, click here to launch the Construction and Detours mapping application

Projects Scheduled for Construction

For information on sewers, road widening, street lighting, City-owned facilities, and new subdivisions scheduled for construction in the near future, use the database above. For descriptions of some maintenance activities, please consult the following pages:

Building Windsor's Future

The City of Windsor will undergo a physical transformation over the coming years due to a significant investment in capital projects. For a detailed list of current projects please visit the Building Windsor's Future page. 

Engineering Requirements for Development in the Public Right-of-Way

For information on the City's engineering standards for construction works within the public right of way, please consult the Public Infrastructure & Right-of-Way Requirements page.

Engineering Department
350 City Hall Square West, 3rd Floor
P. O. Box 1607
Windsor, Ontario
Canada
N9A 6S1

Phone: For general information, call 311. For detailed inquires, call 519-255-6257.
Fax: 519-255-9847
Email: engineeringdept@citywindsor.ca

​​​​ ​​​​​​​