Construction Projects
Skip to main content Skip to navigation Skip to footer

Construction

Using the Construction and Detours Database

You can search and sort projects by several convenient methods:

  • Filter according to time, choosing from All, Current, Planned or Complete.
  • Keyword Search by street name, project type or any word that may appear in the entry.
  • By column, you can click the heading of any column to sort by that category in either ascending or descending order.​
  • By page, you can move from page to page (ten entries per page) using the buttons at the bottom.

Expand the listing to learn more by clicking the plus + symbol and close it by clicking the minus - symbol.

Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Street Name Start Date End Date Estimated Duration Description Contact Contractor Status Keywords Filterable Status Sortable Start Date Sortable End Date
Alten Drive (From Regis Avenue to Ashland Drive) 9/18/2018 9/20/2018 Tuesday, September 18, 2018 to Thursday, September 20, 2018

​Alten Drive from Regis Avenue to Ashland Drive will be closed for resurfacing.

Letter to Residents - Alten.pdfLetter to Residents - Alten.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/18/2018 00:00:00 09/20/2018 00:00:00
Arthur Road (From Seminole Street to CNR tracks) Pending. Pending. Planned

Arthur Road from Seminole Street to the CNR tracks wil be closed for paving.

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade bondy, Public Works 519-255-6560 Ext. 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Ashland Drive (From Regis Avenue to Beachdale Road) 9/17/2018 9/18/2018 Monday, September 17, 2018 to Tuesday, September 18, 2018

Ashland Drive from Regis Avenue to Beachdale Road will be closed for resurfacing.

Letter to Residents - Ashland.pdfLetter to Residents - Ashland.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/17/2018 00:00:00 09/18/2018 00:00:00
Beachdale Road (From Esplanade Drive to Wildwood Drive) 10/11/2018 10/19/2018 Thursday, October 11, 2018 to Friday, October 19, 2018

Beachdale Road from Esplanade Drive to Wildwood Drive will be closed for resurfacing.

Work compeltion extended due to ground conditions requiring more extensive repairs.

 

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 10/11/2018 00:00:00 10/19/2018 00:00:00
Briarbank Drive (From Mulberry Road to Rosebriar Road) Pending. Pending. Planned

Briarbank Drive from Mulberry Road to Rosebriar Road will be closed for resurfacing.

Work will be completed in September / October of 2018​.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Buckingham Drive (From Rose Avenue to Iris Place) 7/9/2018 11/30/2018 Monday, July 09, 2018 to Friday, November 30, 2018

​Starting the week of July 9, 2018, in conjunction with the Windsor Utilities Commission, the City of Windsor - Office of the City Engineer - Engineering Department, will be undertaking a project to construct new sanitary and storm sewers and watermain on Buckingham Drive from Rose Avenue to Iris Place, road rehabilitation on Iris Place from Buckingham Drive to Westminster Boulevard. The sewer and watermain construction are anticipated to be completed in late 2018, if weather permits.

BUCKINGHAM 78-18 - NOTICE TO RESIDENTS.pdfBUCKINGHAM 78-18 - NOTICE TO RESIDENTS.pdf

June Liu-Vajko, Technologist III (519) 255-6257 x6339 or Norbert Poggio, P. Eng., Director of Water Engineering and Distribution at (519) 251-7300 x295 Major Construction (2010) Ltd. Complete road,sewer,watermain Complete All 07/09/2018 00:00:00 11/30/2018 00:00:00
Cabana Road (From Howard Avenue to Dougall Avenue) 5/14/2018 11/30/2018 Monday, May 14, 2018 to Friday, November 30, 2018

​Cabana Road east and west bound lanes from Howard Avenue to Dougall Avenue will occasionally have lane restrictions for various utility relocation work.

Jane He, P. Eng. (519) 255-6100 x6358 N/A Complete None. Complete All 05/14/2018 00:00:00 11/30/2018 00:00:00
Cabana Road East Corridor Improvements Phase 2 (From Howard Avenue to Dougall Avenue) 3/23/2018 11/25/2018 Friday, March 23, 2018 to Sunday, November 25, 2018

​As part of the Cabana Road Corridor Improvements Phase 2, Union Gas will start the installation work of gas main relocation and service line replacement on Cabana Road East between Howard Avenue and Dougall Avenue.  Please watch for periodic isolated lane closures, both East and West bound between Howard Avenue and Dougall Avenue.  All access will be maintained.

Will Ceccacci, construction Project Manager, Union Gas, 519-251-6610 Union Gas Complete road Complete All 03/23/2018 00:00:00 11/25/2018 00:00:00
College Avenue (From Huron Church Road to California Avenue) 9/28/2018 11/30/2018 Friday, September 28, 2018 to Friday, November 30, 2018

​College Avenue between Huron Church Road and California Avenue will be closed for sanitary and storm sewer relocation for the Lancers Sports and Recreation Complex.

Robert Perissinotti Eng. II, City of Windsor (519) 255-6257 x6615 D'Amore Construction (2000) Ltd. Complete sewer Complete All 09/28/2018 00:00:00 11/30/2018 00:00:00
Connaught Avenue (From Prince Road to Felix Avenue) 4/9/2018 8/3/2018 Monday, April 09, 2018 to Friday, August 03, 2018

​Connaught Avenue will be closed from Prince Road to Felix Avenue for Sewer, Watermain and Road Construction. Please follow posted signs. Local traffic only.

Construction Notification to residents- 180-17.pdfConstruction Notification to residents- 180-17.pdf

Adam Mourad, P. Eng. (519) 255-6257 x6614 Sherway Contracting (Windsor) Limited Complete road,sewer,watermain,sidewalk Complete All 04/09/2018 00:00:00 08/03/2018 00:00:00
Curry Avenue (From Northwood Avenue to Labelle Avenue) 10/1/2018 11/23/2018 Monday, October 01, 2018 to Friday, November 23, 2018

​Curry Avenue from Northwood Street south to E.C. Row Avenue and from Labelle Street north to E.C. Row Avenue will be closed for watermain work. Local access for residents only.

Spencer Johnston, Supervisor, Water Construction and Design (519) 251-7300 x609 To be determined. Complete watermain Complete All 10/01/2018 00:00:00 11/23/2018 00:00:00
Dolphin court (From Palms Crescent to Cul-de-sac) Pending. Pending. Planned

Dolphin Court from Palms Crescent to the cul-de-sac will be closed for resurfacing.

 DELAYED DUE TO WEATHER.   TO BE RESCHEDULED.

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Drouillard Road, Seminole Street (Details pending) 6/18/2018 9/14/2018 Monday, June 18, 2018 to Friday, September 14, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on:

Drouillard Road from Seminole Street to Tecumseh Road East (Ward 5)

Seminole Street from Hickory Road to Drouillard Road (Ward 5)

WUC 2018-011 Construction Notification Drouillard.pdfWUC 2018-011 Construction Notification Drouillard.pdf

Public Notice WUC-ENWIN - Drouillard Watermain Project.pdfPublic Notice WUC-ENWIN - Drouillard Watermain Project.pdf

Matt Lockett Water Systems Designer (519) 251-7300 x639 D'Amore Construction (2000) Ltd. Complete watermain Complete All 06/18/2018 00:00:00 09/14/2018 00:00:00
E.C. Row Expressway Cleanup (From Banwell Road to Lauzon Parkway) 1/8/2019 1/10/2019 Tuesday, January 08, 2019 to Thursday, January 10, 2019

​Rolling closures will be in effect on the E.C. Row Expressway between Banwell Road and Lauzon Parkway as Parks and Operations staff work to clear garbage from the shoulder and median areas (weather permitting). Motorists are being asked to be aware of the workers, as there may be occasional delays. Your patience is appreciated. On Tuesday, January 8 to Thursday, January 10, 2019.

Denise Kalas Supervisor Parks (519) 253-2300 x 2737 City of Windsor Parks Department Complete road Complete All 01/08/2019 00:00:00 01/10/2019 00:00:00
Ellis Street (From Marentette Avenue to Elsmere Avenue) Pending. Pending. Planned

Ellis Street from Marentette Avenue to Elsmere Avenue will be closed for paving.​

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Eugenie St (From Eugenie St. to McDougall St.) 9/24/2018 9/28/2018 Monday, September 24, 2018 to Friday, September 28, 2018

Eugenie St and McDougall intersection will be closed in all directions for watermain reconstruction.​

Please be advised that the 5 day full road closure on Eugenie between Ouellette and Howard, including the full closure of the McDougall intersection, will be effective the following dates:

Monday September 24th 2018 at 6:00AM through to Friday September 28th at 6:00PM.

Wade Bondy: 519-255-6560 ext 4234 Coco Paving Inc. Complete watermain,road Complete All 09/24/2018 00:00:00 09/28/2018 00:00:00
Eugenie Street East (From Ouellette Avenue to Howard Avenue) 9/24/2018 12/4/2018 Monday, September 24, 2018 to Tuesday, December 04, 2018

Eugenie Street from Oullette Avenue to Howard Avenue will be reduced to one lane in each direction for watermain construction and road resurfacing.

City Contract 45-18 Pre-Construction Notification -Eugenie.pdfCity Contract 45-18 Pre-Construction Notification -Eugenie.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Complete watermain,road Complete All 09/24/2018 00:00:00 12/04/2018 00:00:00
Everts Avenue (From Norfolk Street to Cul-de-sac) Pending. Pending. Planned

Everts Avenue from Norfolk Street to the cul-de-sac will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Francois Road (From Seminole Street to CN Rail) 8/7/2018 12/15/2018 Tuesday, August 07, 2018 to Saturday, December 15, 2018

​Francois Road between Seminole Street and C.N. Rail, and Franklin Street from Rossini Boulevard to Francois Road will be under construction for sewer, watermain, streetlighting and road rehabilitation. Detour signage will be in place.

Encroachment Letter - Francois Road.pdfEncroachment Letter - Francois Road.pdf 

Janelle Coombs - Public Works - Engineering Department (519) 255-6100 x6407 SLR Contracting Group Inc. Complete road,sewer,watermain Complete All 08/07/2018 00:00:00 12/15/2018 00:00:00
Gladstone Avenue (From Wyandotte Street East to Riverside Drive East) 9/4/2018 12/14/2018 Tuesday, September 04, 2018 to Friday, December 14, 2018

​Gladstone Avenue between Wyandotte Street East and Riverside Drive East will be closed for sewer and pavement reconstruction.

Michael Cappucci, P. Eng., (519) 255-6257 x6355 D'Amore Contracting Ltd. 2000 Complete road,sewer Complete All 09/04/2018 00:00:00 12/14/2018 00:00:00
Gladstone Avenue (From Ypres Avenue to Memorial Drive) 11/5/2018 6/14/2019 Monday, November 05, 2018 to Friday, June 14, 2019

Gladstone Avenue from Ypres Avenue to Memorial Drive will be closed for watermain and road reconstruction.​   Watermain work will be completed in November.   Road work will be completed in the spring.

Wade Bondy, Public Works 519-255-6560 Ext 4234 D'Amore Construction Current watermain,road Current All 11/05/2018 00:00:00 06/14/2019 00:00:00
Gordie Howe International Bridge Project (Details pending) 12/18/2017 12/18/2018 Monday, December 18, 2017 to Tuesday, December 18, 2018

As the preparatory activities progress on the Gordie Howe International Bridge project, and the completion of the first phase of the  perimeter access road (PAR), the WDBA has introduced a new detour route (Monday December 18, 2017) for access to some businesses. The PAR remains closed to non-local traffic. Duration of Detour is unknown at this time, however if required, a one year place holder may be used at this time. 

A map illustrating the new access route is attached for your reference.  

This four kilometre road will circle the Canadian Port of Entry (POE) and provide access into the POE for employees, visitors and suppliers. It will also replace existing roadways that local businesses use to access facilities. Once construction of the Gordie Howe International Bridge project is complete, the City of Windsor will assume ownership of the PAR and will be responsible for maintaining the road as a municipal roadway.

PAR opening_sketch for Brighton Beach Aggregates.pdfPAR opening_sketch for Brighton Beach Aggregates.pdf

PAR opening_sketch for Nemak.pdfPAR opening_sketch for Nemak.pdf

 

Joseph Dattilo, P. Eng. Project Administrator (519) 255-6100 x6825 To be determined. Complete bridge,road Complete All 12/18/2017 00:00:00 12/18/2018 00:00:00
Hall Avenue (From Tecumseh Road East to Hanna Street East) Pending. Pending. Planned

Hall Avenue from Tecumseh Road to Hanna Street will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Halpin Road (From Mulberry Road to Wildwood Drive) 11/6/2018 11/8/2018 Tuesday, November 06, 2018 to Thursday, November 08, 2018

Halpin Road from Mulberry Road to Wildwood Drive will be closed for resurfacing.

Letter to Residents - Halpin.pdfLetter to Residents - Halpin.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 11/06/2018 00:00:00 11/08/2018 00:00:00
Halstead Crescent (From Deerbrook Drive to Deerbrook Drive) Pending. Pending. Planned

Halstead Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Work to be done in September / October of 2018

PRECISE DATE OF WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Hanna Street East (From Moy Avenue to Benjamin Avenue) Pending. Pending. Planned

Hanna Street East from Moy Avenue to Benjamin Avenue will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED.

Wade bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Huron Church Road (From Wyandotte Street West to Girardot Street) 8/5/2018 8/12/2018 Sunday, August 05, 2018 to Sunday, August 12, 2018

Southbound Huron Church Road from Wyandotte Street West to Girardot Street will have lane restrictions for pothole patching, nightly from 7:00pm to 7:00am.

Roberta Harrison, Maintenance Coordinator 519-255-6560 Ext 4241 Alite Road Patching Complete road Complete All 08/05/2018 19:00:00 08/12/2018 00:00:00
Lake Trail Drive (From Southwood Lakes Boulevard to Southwood Lakes Boulevard) 5/28/2018 6/22/2018 Monday, May 28, 2018 to Friday, June 22, 2018

​Lake Trail Drive, from Southwood Lakes Blvd to Southwood Lakes Blvd., will experience lane restrictions for road resurfacing.

Wade Bondy, 519-255-6560 ext. 4234 To be determined. Complete road Complete All 05/28/2018 00:00:00 06/22/2018 00:00:00
Langlois Avenue (From Tecusmeh Road East to Shepherd Street) Pending. Pending. Planned

Langlois Avenue from Tecumseh Road East to Shepherd Street will be closed for paving.

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Lens Avenue (From Elsmere Avenue to Woodlawn Avenue) 9/19/2018 9/19/2018 Wednesday, September 19, 2018

Lens Avenue from Elsmere Avenue to Woodlawn Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - Lens Sept 19.pdfLetter to Residents - Surface Asphalt - Lens Sept 19.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/19/2018 00:00:00 09/19/2018 00:00:00
Lillian Avenue (From Grand Marais Road to Vanier Street) 9/17/2018 12/14/2018 Monday, September 17, 2018 to Friday, December 14, 2018

Lillian Avenue will be closed for pavement reconstruction.

Letter to Residents - Reconstruction - Lillian.pdfLetter to Residents - Reconstruction - Lillian.pdf

Wade Bondy, Contracts Coordinator 519-255-6560 Ext 4234 SheaRock Construction Group Inc. Complete road Complete All 09/17/2018 00:00:00 12/14/2018 00:00:00
Lonsdale Crescent (From Deerbrook Drive to Deerbrook Drive) Pending. Pending. Planned

Lonsdale Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

Work to be done in September / October of 2018

PRECISE DATE OF WORK TO BE DETERMINED​

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Malden Road (From Chappus Street to Continental Avenue) 8/13/2018 9/10/2018 Monday, August 13, 2018 to Monday, September 10, 2018

​The Windsor Utilities Commission will be reconstructing the watermain on Malden Road from Chappus Street to Continental Avenue.

2018-022 Preconstruction Notice Malden.pdf2018-022 Preconstruction Notice Malden.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 Coco Paving Complete watermain Complete All 08/13/2018 00:00:00 09/10/2018 00:00:00
Malden Road (From Continental to City of Windsor City Limits) 9/20/2018 9/24/2018 Thursday, September 20, 2018 to Monday, September 24, 2018

Northbound Malden Road from Continental to the City of Windsor limits will be closed for paving.​

Letter to Residents - Surface Asphalt - Malden.pdfLetter to Residents - Surface Asphalt - Malden.pdf

Wade Bondy: 519-255-6560 ext 4234 To be determined. Complete road Complete All 09/20/2018 00:00:00 09/24/2018 00:00:00
Marentette Avenue (From Hanna Street to Ellis Street) Pending. Pending. Planned

Marentette Avenue from Hanna Street to Ellis Street will be closed for paving.

Work to be completed in Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Matthew Brady Boulevard (From St. Rose Avenue to Edgar Street) 5/7/2018 12/15/2018 Monday, May 07, 2018 to Saturday, December 15, 2018

​Matthew Brady Boulevard from St. Rose Avenue to Edgar Street will be restricted to local traffic for road, sewer, watermain and gas rehabilitation.

Travis Frickey, Technologist (519) 255-6257 x6305 SheaRock Construction Group Inc. Complete road,sewer,watermain Complete All 05/07/2018 00:00:00 12/15/2018 00:00:00
Mercer Street (From Giles Boulevard to Erie Street) Pending. Pending. Planned

Mercer Street from Giles Boulevard to Erie Street will be closed for paving.

Work to be completed in Fall of 2018

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Metcalfe Street (From Arthur Road to Pillette Road) Pending. Pending. Planned

Metcalfe Street from Arthur Road to Pillette Road will be close for paving.

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Ouellette Avenue (From Wyandotte Street to Elliott Street) 2/26/2018 11/30/2018 Monday, February 26, 2018 to Friday, November 30, 2018

The construction of Ouellette Avenue Streetscape Improvements Phase 6 is almost complete. The roadway will be fully open to traffic after 12:00am, Friday November 23, 2018. Transit Windsor will resume their regular bus routes on Ouellette Avenue tomorrow following the opening. Please visit www.transitwindsor.ca for more information.

31-17 OUELLETTE Ltr Prop Owners re commencement of construction.pdf31-17 OUELLETTE Ltr Prop Owners re commencement of construction.pdf

Jane He - 519-255-6257 x 6358 J & J Lepera Infrastructures Inc Complete road,sewer Complete All 02/26/2018 00:00:00 11/30/2018 00:00:00
Palms Crescent (From Deerbrook Drive to Deerbrook Drive) Pending. Pending. Planned

Palms Crescent from Deerbrook Drive to Deerbrook Drive will be closed for resurfacing.

 DELAYED DUE TO WEATHER. TO BE RESCHEDULED.

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Peter Street (From Prince Road to South Street) Pending. Pending. Planned

Peter Street from Prince Road to South Street will be closed for paving.

Work to be completed in the Spring of 2019.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Princess Avenue (From Tecusmeh Road East to Adstoll Avenue) 9/18/2018 9/18/2018 Tuesday, September 18, 2018

Princess Avenue from Tecumseh Road East to Adstoll Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - Princess.pdfLetter to Residents - Surface Asphalt - Princess.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 09/18/2018 00:00:00 09/18/2018 00:00:00
Regis Avenue (From Beachdale Road to Widlwood Drive) 9/20/2018 9/25/2018 Thursday, September 20, 2018 to Tuesday, September 25, 2018

Regis Avenue from Beachdale Drive Road to Wildwood Drive will be closed for resurfacing.

Letter to Residents - Regis.pdfLetter to Residents - Regis.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/20/2018 00:00:00 09/25/2018 00:00:00
Riverside Drive East (From Lauzon Road to Solidarity Towers) 6/1/2018 12/21/2018 Friday, June 01, 2018 to Friday, December 21, 2018

​Riverside Drive East, from Lauzon Road to Solidarity Towers, will be reduced to one lane (eastbound traffic only) for road, sewer and watermain rehabilitation.

Anna Godo P. Eng., 519-255-6257, ext. 6508 Amico Infrastructues Inc. Complete road,sewer,watermain Complete All 06/01/2018 00:00:00 12/21/2018 00:00:00
Riverside Drive East and Lauzon Road (From Dieppe Street to Solidarity Towers) 8/21/2018 12/21/2018 Tuesday, August 21, 2018 to Friday, December 21, 2018

​As part of ongoing work for the Riverside Drive Vista Project, the intersection of Riverside Drive East and Lauzon Road was re-opened on Tuesday August 21, 2018. However, the stretch from Lauzon Road east to Solidarity Tower will see intermitten lane reductions until the end of August.

The next phase of the project, beginning September 4th, will see Riverside Drive East from Dieppe Street to Solidarity Towers closed with local traffic permitted. Detour signage will be in place. That work is expected to be completed by the end of December.

Anna Godo, P. Eng. (519) 255-6100 x6508 Amico Infrastructures Inc. Complete road,sewer,watermain Complete All 08/21/2018 00:00:00 12/21/2018 00:00:00
Riverside Drive Vista Project, Phalse 1, Stage 2 (From Riverdale Avenue to Lauzon Road) 6/18/2018 12/21/2018 Monday, June 18, 2018 to Friday, December 21, 2018

Construction of the Riverside Drive Vista Improvement Project Phase 1 Stage 2 will result in the closure of Riverside Drive East from Lauzon Road to Riverdale Avenue. Local traffic will be permitted throughout the work but property owners are cautioned that delays are possible. Construction crews will be rebuilding the roadway with the intent of reducing driver speed and volume, while increasing safety along the scenic drive. Relocations of Hydro, Bell, Cogeco and Union Gas were undertaken in advance of the sewer, watermain and road works. Detour signage will be in place, with Wyandotte Street being the best east-west option close to Riversdie Drive.

Riverside P1 S2 Const Notice.pdfRiverside P1 S2 Const Notice.pdf

Notification Letter.pdfNotification Letter.pdf 

RIVERSIDE VISTA - objects in ROW letter 2017.pdfRIVERSIDE VISTA - objects in ROW letter 2017.pdf 

BP3.2.2  - Landscaping in the Right-Of-Way.pdfBP3.2.2 - Landscaping in the Right-Of-Way.pdf

RFT 7-18 Riverside  Ph 1 St 2 letter to residents.pdfRFT 7-18 Riverside Ph 1 St 2 letter to residents.pdf

Anna Godo, P. Eng. (519) 255-6257 Ext. 6508; Will Ceccacci, Union Gas, (519) 251-6810 Enwin Utilities, Bell, Cogeco, and Union Gas Complete road Complete All 06/18/2018 00:00:00 12/21/2018 00:00:00
Rossini Boulevard (From Tecumseh Road East to Griffin Court) 7/3/2018 8/31/2018 Tuesday, July 03, 2018 to Friday, August 31, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Rossini Boulevard from Tecumseh Road East to Griffin Court (Ward 5).

City Contract 06-18 Pre-Construction Notification -Rossini.pdfCity Contract 06-18 Pre-Construction Notification -Rossini.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 SheaRock Construction Complete watermain Complete All 07/03/2018 00:00:00 08/31/2018 00:00:00
Rossini Boulevard (From Tecumseh Road East to Griffin Court) 9/21/2018 9/21/2018 Friday, September 21, 2018

Rossini Boulevard from Tecumseh Road to Griffin Court will be closed for paving.

Letter to Residents - Surface Asphalt - Rossini.pdfLetter to Residents - Surface Asphalt - Rossini.pdf

Wade Bondy, Publioc Works 519-255-6560 Ext 4234 SheaRock Construction Group Inc. Complete road Complete All 09/21/2018 00:00:00 09/21/2018 00:00:00
Ryerson Road (From Regis Avenue to Ashland Drive) 9/17/2018 9/19/2018 Monday, September 17, 2018 to Wednesday, September 19, 2018

Ryerson Road from Regis Avenue to Ashland Drive will be closed for resurfacing.

Letter to Residents - Ryerson.pdfLetter to Residents - Ryerson.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Coco Paving Inc. Complete road Complete All 09/17/2018 00:00:00 09/19/2018 00:00:00
Sandwich Street Roundabout (From University Avenue West to Rosedale Avenue) 6/19/2017 9/7/2018 Monday, June 19, 2017 to Friday, September 07, 2018

​The Sandwich Street roundabout will be closed until September 7, 2018 to allow for the finishing work needed on the lands surrounding the roundabout area. Detour signs will be in place.

Tiffany Pocock, P. Eng. (519) 255-6257 x6506 tpocock@citywindsor.ca or Janelle Coombs, P. Eng. (519) 255-6257 x6407 jcoombs@citywindsor.ca Major Construction (2010) Ltd. Complete road Complete All 06/19/2017 00:00:00 09/07/2018 00:00:00
Seminole Street (From Central Avenue to Chandler Road) 8/27/2018 11/23/2018 Monday, August 27, 2018 to Friday, November 23, 2018

​Seminole Street from Central Avenue to Chandler Road will be reduced to one lane in each direction for watermain work.

Spencer Johnston, Supervisor, Water Construction and Design (519) 251-7300 x609 To be determined. Complete watermain Complete All 08/27/2018 00:00:00 11/23/2018 00:00:00
South Pacific Avenue (From Jeremiah Court to Southdale Drive) 9/28/2018 10/2/2018 Friday, September 28, 2018 to Tuesday, October 02, 2018

South Pacific Avenue from Jeremiah Court to Southdale Drive will be clsoed for paving.

Letter to Residents - South Pacific Sept 27-2018.pdfLetter to Residents - South Pacific Sept 27-2018.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 09/28/2018 00:00:00 10/02/2018 00:00:00
St John Street (From Menard Street to Dieppe Street) 10/11/2018 10/12/2018 Thursday, October 11, 2018 to Friday, October 12, 2018

St John Street and Clairview Avenue will be closed for paving.

Letter to Residents - Surface Asphalt - St John Clairview.pdfLetter to Residents - Surface Asphalt - St John Clairview.pdf

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Complete road Complete All 10/11/2018 00:00:00 10/12/2018 00:00:00
Tecumseh Road East (From Hall Avenue to Turner Road) 4/2/2018 7/27/2018 Monday, April 02, 2018 to Friday, July 27, 2018

​The Windsor Utilities Commission will be reconstructing the watermains on Tecumseh Road East from Hall Avenue to Turner Road.

Tecumseh Public_Notice_WUC-Road Closure.pdfTecumseh Public_Notice_WUC-Road Closure.pdf

 

 

Wade Bondy, Contracts Coordinator, Public Works 519-255-6560 Ext 4234 SheaRock Construction Complete watermain,road Complete All 04/02/2018 00:00:00 07/27/2018 00:00:00
Tecumseh Road West (From Partington Avenue to Huron Church Road) 9/4/2018 12/21/2018 Tuesday, September 04, 2018 to Friday, December 21, 2018

Tecumseh Road West from Partington Avenue to Huron Church Road will be restricted to one lane in each direction for watermain and road rehabilitation.

Pre-Construction Notification - Tec Rd West.pdfPre-Construction Notification - Tec Rd West.pdf

Wade Bondy, Public Works (519) 255-6560 x4234 D'Amore Construction (2000) Ltd. Complete watermain,road Complete All 09/04/2018 00:00:00 12/21/2018 00:00:00
Tranby Avenue (From Mathew Brady Blvd. to Isabelle Place) 9/14/2018 12/14/2018 Friday, September 14, 2018 to Friday, December 14, 2018

​Tranby Avenue from Mathew Brady Blvd. to Isabelle Place will be closed for reconstruction.

Wade Bondy: 519-255-6560 ext. 4234 To be determined. Complete road Complete All 09/14/2018 00:00:00 12/14/2018 00:00:00
Vimy Avenue (From Walker Road to Byng Road) Pending. Pending. Planned

Vimy Avenue from Walker Road to Byng Road will be closed for paving.​

Work to be completed in the Fall of 2018.

PRECISE DATE FOR WORK TO BE DETERMINED

Wade Bondy, Public Works 519-255-6560 Ext 4234 Mill-Am Corporation Planned road Planned All 01/01/0001 00:00:00 01/01/0001 00:00:00
Wellington Avenue (From College Avenue to Tecumseh Road West) 8/13/2018 11/23/2018 Monday, August 13, 2018 to Friday, November 23, 2018

​The Windsor Utilities Commission will be reconstructing the watermain on Wellington Avenue from College Avenue to Tecumseh Road West.

2018-022 Preconstruction Notice Wellington South.pdf2018-022 Preconstruction Notice Wellington South.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 Coco Paving Complete watermain Complete All 08/13/2018 00:00:00 11/23/2018 00:00:00
Wellington Avenue (From Wyandotte Street West to University Avenue) 8/20/2018 11/23/2018 Monday, August 20, 2018 to Friday, November 23, 2018

​The Windsor Utilities Commission will be reconstructing the watermain on Wellington Avenue from Wyandotte Street West To University Avenue.

2018-022 Preconstruction Notice Wellington North.pdf2018-022 Preconstruction Notice Wellington North.pdf

Spencer Johnston, B.Sc., C.E.T. (519) 251-7300 x609 Coco Paving Complete watermain Complete All 08/20/2018 00:00:00 11/23/2018 00:00:00

Projects Under Construction

For information on projects currently under construction, click here to launch the Construction and Detours mapping application

Projects Scheduled for Construction

For information on sewers, road widening, street lighting, City-owned facilities, and new subdivisions scheduled for construction in the near future, use the database above.  For descriptions of some maintenance activities, please consult the following pages:

Building Windsor's Future

The City of Windsor will undergo a physical transformation over the coming years due to a significant investment in capital projects. For a detailed list of current projects please visit  the Building Windsor's Future page. 

Engineering Requirements for Development in the Public Right-of-Way

For information on the City's engineering standards for construction works within the public right of way, please consult the Public Infrastructure & Right-of-Way Requirements page.

Engineering Department
350 City Hall Square West, 3rd Floor
P. O. Box 1607
Windsor, Ontario
Canada
N9A 6S1

Phone: For general information, call 311. For detailed inquires, call 519-255-6257.
Fax: 519-255-9847
Email: engineeringdept@citywindsor.ca

​​​

 

​ ​​​​​​