Biosolids Management Strategy

Notice of Study Completion and Environmental Study Report

The City of Windsor undertook a Schedule C Municipal Class Environmental Assessment (Class EA) to develop an integrated long-term, sustainable, and cost-effective biosolids management plan for the two municipal wastewater treatment plants: the Lou Romano Water Reclamation Plant and the Little River Pollution Control Plant. The Class EA reviewed the current management and processing of biosolids for the two wastewater treatment plants and created a guide for how the City of Windsor will meet the needs of our growing community over the next 30 years. This study offered an opportunity to consider biosolids management solutions that improve energy efficiency, plan for effective land use, reduce energy consumption, limit greenhouse gas (GHG) emissions, and promote smart/green energy solutions as outlined in the City of Windsor Corporate Energy Management Plan and Community Energy Plan.

Windsor map indicating Lou Romano Water Reclamation Plant, biosolids processing facility & Little River Pollution Control Plant

This study satisfied phases 1 through 4 of the Class EA process, which involved the evaluation of alternative solutions and conceptual designs for biosolids management. An Environmental Study Report (ESR) has been completed and documents the planning and decision-making process for this study. By this Notice, the ESR is being placed in the public record for review in accordance with the requirements of the Municipal Class Environmental Assessment process.

Documents:

Interested persons are asked to provide written comments to the project team by October 29, 2023.
Mr. Ed Valdez, P. Eng.
Manager of Process Engineering & Maintenance
City of Windsor
4155 Ojibway Parkway
Windsor, Ontario, N9C 4A5
Telephone: (519) 253-7111 ext. 3366
Email: evaldez@citywindsor.ca
Dr. Jian Li, P. Eng.
Consultant Project Manager
Stantec Consulting Ltd.
140 Ouellette Place, Suite 100
Windsor, Ontario, N8X 1L9
Telephone: (519) 966-2250 ext. 240