Dougall Avenue/CN Rail Pedestrian Underpass and Multi-Use Trail
A pedestrian underpass under the CN Railway and multi-use trails to connect the multi-use trails south of the CN Railway and South Cameron Boulevard as part of the City's active transportation network.
Design-Build Contractor: Amico Infrastructures
Status: Complete
For detailed inquiries, call Paul Mourad, P. Eng., at (519) 255-6100 ext. 6119.
Email: pmourad@citywindsor.ca
For general information, call 311.