Municipal Infrastructure Requirements
The City of Windsor is currently in the process of updating our guidelines regarding requirements for the design and construction of municipal infrastructure. This project is scheduled to be completed by the end of 2020. Updated guidelines will be posted on this page as they become available.
With the exception of the material posted below, the 2015 version of the Development Manual will continue to govern requirements for the design and construction of all other municipal infrastructure elements until specified otherwise.
Stormwater management is required to be designed in accordance with the
Windsor/Essex Region Stormwater Management Standards Manual.
Note that in instances where a conflict is specified for stormwater design elements between the Development Manual and the Windsor/Essex Region Stormwater Management Standards Manual, the requirements of the latter will govern.
Engineering Department
Development, Projects and Right-of-Way
350 City Hall Square West, 2nd Floor, Suite 210
Windsor, Ontario
Canada
N9A 6S1
Phone: For general information, call 311. For detailed inquires, call (519) 255-6257.
Email: engineeringdept@citywindsor.ca